Friday, August 2, 2013

Walls going up on the condo

Here is the beige vinyl siding and the shingles on our condo.

The door handles will be levers like these in brushed nickel finish.

The concrete is delivered.

Pumping the concrete through the elevator to the job site.

Using the cement float to smooth the concrete floor. No 2-by-4 like when Carl helped his dad.

 We've got walls"


Now we have a front door!

This is the basement.

The garage walls are up.

Now it looks like a garage.

This is the north side of the condo looking toward garage.

The patio was poured today.

Looking into the kitchen (right) from the garage.

This is now the front entry.



No comments:

Post a Comment